French energy group ENGIE has announced the development of its first hybrid energy project in Europe, co-locating wind energy generation with battery energy storage systems (BESS). The facility is being built in Băleni, Galați County, located in southeastern Romania.
The storage asset is being installed directly within ENGIE’s operational 50 MW Băleni wind farm, which has been active since 2013. The grid-connected battery will feature a power capacity of 5 MW and a storage capacity of 10 MWh, allowing it to deliver maximum electricity output to the grid for a continuous two-hour window. The unit is scheduled to be fully commissioned by the end of this year.