We use cookies
to help provide you with a good experience on our website. By continuing to browse the website, you are agreeing to our use of cookies.

Corinth manufacturing Black Sea Midia project pipes

BLACK SEA
OIL & GAS

Corinth manufacturing Black Sea Midia project pipes

Corinth Pipeworks (CPW) will supply steel pipes for the Midia gas development in the Romanian sector of the Black Sea - Offshore reports

These will comprise 8-in. pipes for the infield line and 16-in. steel pipes for the project, operated by Black Sea Oil & Gas, which is harnessing 320 bcf of gas from the Ana and Doina fields, 120 km (75 mi) offshore in 70 m (229 ft) water depth.

Learn more

CPW’s scope extends to external 3LPE anti-corrosion coating and concrete weight coating applied at the same location as pipe manufacturing in Thisvi, Greece.

Offshore installation should start in 2020.

The Midia project, carrying an estimated investment cost of $400 million, is due to be commissioned by early-2021 and will produce 1 bcm/yr, equivalent to 10% of Romania’s consumption.

It involves drilling of five production wells, and installation of a subsea production system at the Doina field which will be tied back to an unmanned production platform at the Ana field via an 18-km (11-mi) pipeline.

From there, a 121-km (75-mi) pipeline will transport the gas to an onshore location for onward delivery to a new gas treatment plant.

Relevant news

BLACK SEA
OIL & GAS
Who will you meet at the Black Sea Oil & Gas conference?
Up-to-date attendee list
BLACK SEA
OIL & GAS
Is there hope for the Black Sea region?
Summary of recent market trends and developments
BLACK SEA
OIL & GAS
Onshore profile of the Black Sea countries
An overview of projects and trends
BLACK SEA
OIL & GAS
Trident Acquisitions offers $1 bln of investment in in tender to develop Black Sea shelf section via PSA
BLACK SEA
OIL & GAS
Black Sea MGD Project Gets Government Nod
BLACK SEA
OIL & GAS
BSOG, Petro Ventures to invest $400 mln in Romania