Subscribe
GO NET ZERO ENERGY CENTRAL & EASTERN EUROPE

INA successfully pilots sustainable aviation fuel production

For the first time in its history, the Rijeka Refinery has successfully produced Sustainable Aviation Fuel (SAF). In an effort to reduce its carbon footprint and comply with European renewable energy regulations, INA has completed a pilot project that focuses on processing biogenic feedstock at the Hydrocracking Unit of the Rijeka Refinery.

Source: INA

Alongside SAF, a notable amount of renewable diesel (HVO – Hydrotreated Vegetable Oil) was also generated. The European Union has established binding targets through the Renewable Energy Directive to cut greenhouse gas emissions and enhance the share of renewable energy sources in transportation. By 2030, EU member states must ensure a suitable portion of renewables in the transport sector, emphasizing the importance of advanced biofuels and Sustainable Aviation Fuel (SAF) to decarbonize the aviation industry. In response to these mandates, INA aims to finalize all preparations and be ready to provide a continuous supply of sustainable aviation fuel to the market by 2029.

Processing biogenic feedstock within existing infrastructure is one of the most efficient ways to decarbonise refinery operations and increase the share of renewables in the transport sector. Thanks to the commitment of our internal team and the collaboration with partners from MOL Group and CLG, we have successfully created the necessary preconditions to meet the future needs of the market and our customers

Ivica Jerbić, Director of Development at INA

The initiative was executed in collaboration with Chevron Lummus Global (CLG), the unit’s licensor, with the goal of testing the co-processing of 5% POME (Palm Oil Mill Effluent – a by-product of palm oil production) alongside fossil feedstocks. This pilot project took place from May 5 to May 13, 2025, during which 1,000 tonnes of biogenic feedstock were processed. The entire procedure received certification from the independent auditor Bureau Veritas d.o.o., adhering to the ISCC (International Sustainability and Carbon Certification) standard for sustainable biofuels.

Preparing for the pilot project took eight months, given the complexities associated with processing a new type of feedstock and its unique physical and chemical properties. The project encompassed various activities, including procuring specialized filters, modifying laboratory methods, enhancing the capacities of the Hydrocracking and Vacuum Distillation units, and ensuring the controlled handling of the biogenic feedstock under existing operating conditions. Throughout the test run, over 400 samples were collected for comprehensive analysis at INA’s Central Testing Laboratory (CIL), while the biogenic content (C14 analysis) was evaluated by accredited external laboratories, including the Ruđer Bošković Institute in Zagreb and Isotoptech Zrt. in Debrecen.

Relevant industry events

All events

Relevant news

The EU’s Massive Solar Surge Just Broke Records

The European Union’s renewable energy transition reached a historic milestone in 2025, driven by an unprecedented expansion of solar power and a massive spike in electric vehicle (EV) adoption. According to the latest quarterly market reports, the bloc is successfully stabilizing its energy markets while rapidly accelerating its green infrastructure.

Read more
icon
Vienna’s Geothermal Testing Beats Expectations

A joint geothermal initiative in Vienna’s Aspern district has surpassed initial performance projections, paving the way for a massive expansion of sustainable district heating in the Austrian capital. Spearheaded by local utility Wien Energie and energy firm OMV, recent test drilling indicates the city's underground resources are hotter and more abundant than previously thought.

Read more
icon
Romanian division of ENGIE launches its first hybrid project in Europe

French energy group ENGIE has announced the development of its first hybrid energy project in Europe, co-locating wind energy generation with battery energy storage systems (BESS). The facility is being built in Băleni, Galați County, located in southeastern Romania.

The storage asset is being installed directly within ENGIE’s operational 50 MW Băleni wind farm, which has been active since 2013. The grid-connected battery will feature a power capacity of 5 MW and a storage capacity of 10 MWh, allowing it to deliver maximum electricity output to the grid for a continuous two-hour window. The unit is scheduled to be fully commissioned by the end of this year.

Read more
icon